RAY Attachments leads the construction equipment industry with innovative excavator attachments designed for precision foundation engineering. Our flagship Side Grip Pile Driver series combines cutting-edge technology and German-engineered components to deliver unmatched performance. Visit www.rayattachments.com to explore our full range.
Solar/wind energy foundations
Urban infrastructure projects
Bridge and flood control systems
70% labor reduction
360° rotation for confined spaces
15% fuel efficiency improvement
SV Series Motors:
SV30-50: Italian OMFB motors (proven reliability over 2+ years)
SV60-70: American Parker motors (higher torque output)
Technical Specifications:
Centrifugal force: 206-723 kN
Frequency range: 41.7-50 Hz
High-frequency vibrations disrupt soil particle bonds
Reduces skin friction by 60-80%
Enables 18m pile penetration in common soil
Component | Technology Details |
---|---|
Vibration Motors | Italian OMFB/SV30-50 and American Parker/SV60-70 with intermediate gear design |
Eccentric System | Slot-milled gear structure for lightweight high torque output (22% weight reduction) |
Bearings | Imported FAG bearings (50% longer lifespan) |
Hydraulic Cylinders | Triple-seal design (imported seals) with 1-year warranty |
Manufacturing | German molding die grinding machine mirror processing,zero iron particle generation |
Tonnage range: 13-40T
Hydraulic flow: 80-256 LPM
Soft soil: 12-18m pile length
Hard soil: Requires pre-drilling with auger
H-beams: H100-H500
Timber piles: φ120-600mm
Model | Eccentric Moment (kg·m) | Centrifugal Force (kN) | Max Pile Length (m) |
---|---|---|---|
SV30 | 3.0 | 297 | 12 |
SV70 | 7.3 | 723 | 18 |
Use included self-developed the verticality detector for ±25° angle adjustment.
Hard soil: 2,500-2,800 RPM
Loose soil: 2,000-2,500 RPM
Lightweight design (1.8-3.24T) reduces fuel consumption by 15%.
Daily: Check clamping pressure
Weekly: Lubricate moving parts
Monthly: Inspect bearing temperature (<70°C)
Issue | Cause | Solution |
---|---|---|
Reduced excitation | Low hydraulic flow | Check pump pressure |
Bearing overheating | Lubrication failure | Replace with high-temp grease |
Integral plate gantry boring ensures 1-2 silk coaxiality
German mirror grinding eliminates iron particle contamination
Dual-layer shock absorption system
25-day rapid delivery with modular design
Free the verticality detector
1-year warranty on hydraulics
Global technical support